Location and handover point
For a handover in an office building, the floor, receiving person and route beyond the entrance matter. A commercial property outside the capital instead needs its own locality and goods reception details. Where one customer occupies several buildings, show which package belongs to each. For bulky equipment, provide packed dimensions and any known narrow points at the requested receiving location.
Planning example for this task
Start with the specific machine in transport condition. List loose assemblies as separate packages; the factory address must match where preparation, loading and release actually take place.
Confirm the address before copying a reference
Use the confirmed address of the actual recipient. Check town, postcode and goods entrance together; an order or billing address is usable only when goods are received there.
What matters
- Distinguish country and actual municipality
- Specify building, floor and receiving person
- Assign packages to individual buildings
- Document transport condition rather than operating dimensions
- Assign preparation, loading and unloading responsibilities
- Confirm unloading point and available handling equipment
Sources and their scope
Sources describe countries or individual locations. They do not confirm a transport service or an available date. Access and execution must be agreed for the actual job.
Further information
